Aug 2026

SE Wall: Veneer IV

Short & ugly

SE Wall: Veneer III

Mostly electrical

Jul 2026

SE Wall: Veneer II

SE Wall: Veneer IV

2026-08-17

With temps in the 70s, it was a beautiful weekend.

I put a few hours into adding a French drain behind the new wall and next to the stairs. So much of what we're doing is centered around water management.

The rest of the time was spent adding more rocks to the new wall.

Drive: SE Wall: Another row done
New drain next to stair wall

Short & ugly

2026-08-10

Saturday was hot and wet, and pretty much all I did was move rock. I spent some time sorting through the ugly stuff—the pieces that just won’t work on the walls.

Sunday, I had some visitors, so no work got done. Sometimes you just have to take a day off!

SE Wall: Veneer III

2026-08-10

What a Hot and humid weekend, but I was able to put down another dozen rocks on the Driveway's Southeast wall.

Drive: SE Wall: Another dozen rocks put down

Mostly electrical

2026-08-03

The weekend started out well as I worked on the driveway’s southeast wall, until a sudden downpour forced me inside. After changing clothes, I switched projects and updated the living room lighting. I removed the old switch and the external light timer, added a hidden smart switch for the outdoor lights, and installed two WiFi switches for the indoor lighting. With a bit of extra time, I also made some wooden faceplates to complete the setup. More more walking throught the room in the dark!

Living room remote switch

SE Wall: Veneer II

2026-07-29

Another weekend where the weatherman called for rain, but we stayed dry!
It was two days of gluing rocks together; this stuff takes forever.

Driveway: SE wall veneer work